Oxford, Connecticut
Oxford, Connecticut: Midstate built one regulation football field and one regulation soccer field. The job consisted of screening 12,000 yards of topsoil, importing more than 18,000 yards of borrow, installing a drainage system below the fields, and installing sod over the entire two fields. The job had many environmental challenges as well as a very tight schedule. The job came in on time and on budget.
Storrs, Connecticut
Storrs, Connecticut: Midstate Site Development was awarded the contract in December 09 for the new social science classrooms at UCONN’s main campus. The new 96,000 sq. foot facility will be located in the heart of the campus. This necessitates the highest level of safety and precaution for both pedestrians and vehicle traffic. During this project, MSD has excavated thousands of yards of polluted and contaminated material to an off-site location. We value-engineered a support system for a main electrical duct bank that was discovered during the excavation, and this saved the customer thousands in sheeting costs. Despite extremely harsh 2010 weather conditions (rain ,snow, and sub-zero temperatures), the project is on time.
Enfield and Somers, Connecticut
Enfield and Somers, Connecticut: Midstate Site Development was low bidder on this Department of Public Works project. The project goals included: replacement of 16,230 feet of sewer main to all 5 prisons, decommissioning a wet well and pump station, installing a well house and new 8” watermain, installing a bridge over wetlands, reconstruction of the intersection at rt. 220 and rt. 404, and building a macerator building.
Bloomfield, Connecticut
Bloomfield, Connecticut: Midstate Site Development was the low bidder on these two separate projects slated for the summer of 2009. Both projects had to be started the day after school dismissed for summer break and be totally complete by the start of school in the fall. Midstate hit the job running with multiple crews. We made up to 8 sidewalk concrete pours per day, reclaimed multiple parking lots and main driveways, installed new sewer and water mains, site lighting, and landscaping. The project was done ahead of schedule and made for a smooth transition for teachers and students when they returned.
Bristol, Connecticut
Bristol, Connecticut: Midstate Site Development has been involved in projects at ESPN since 2001. Midstate is proud to be listed as one of ESPN -Walt Disney’s preferred contractors. We've been instrumental in the reconstruction of their main campus green and during that effort, we've maintained the highest quality of safety for ESPN employees and work force. We transformed their infrastructure laying miles of duct banks, drainage, raising grades 15 feet, paving walkways, installing thousands of feet of granite curb and an athletic field (seen on Sport’s Center).
West Hartford, Connecticut
West Hartford, Connecticut: Midstate Site Development was the site contractor chosen for the new NBC studios in West Hartford. There were some challenges we had to deal with before we put a shovel in the ground. The first thing we tackled was the demolition of the rear part of the existing studios, making room for the new studios. This had to be accomplished while they stayed on air. The next step was to blast 9,000 yards of ledge that was less than 12’ off the existing building - without shaking the camera’s and digital equipment. Finally, we had to re-route all the existing communication and electrical duct banks, plus tear down the existing studios - all without any interruptions to day-to-day operations. All of this was accomplished while NBC stayed on air twelve feet away throughout the project.
Our projects display our capabilites in residential and commmercial site development, foundations, excavation, road construction, and specialty construction such as sewer, water, utilies, and drainage projects.
PAST PROJECTS
Schools And Universities: Dodd Middle School Canton Junior/senior High School Bleachers Sheehan High School New Britain High School Additions River St. School Fire Line Replacement New Britain High Alt. Behavior Center Bloomfield High School, Phase Ii Oxford High School Carmen Arace Middle School New Social Science: West Building Fairfield University Residence Quad Wesleyan University Film Studies Health Care Facilities: Veterans Hospital Water Main Coventry Group Home Jerome Home Elim Park Baptist, Wellness Center VA Adult Care Facility Connecticare Renovation Project Natchaug Hospital Triad Healthcare |
Commercial And Industial Panera Bread, Westfield Shopping Mall Patco Gas Station Costco Intel Motion System Site Work Renovations Sovereign Bank Photovoltaic Cell Installation Turbojet Fuel Supply Perry Technology Building Middletown Nissan BPT Innovation Center Advance Auto Parts Men’s Warehouse Ameripride Service Places Of Worship First Church Of Windsor Elim Park Baptist, Bethel Place Chapel Farmington Ave. Baptist Church Municipal And Government Work Somers Correctional-somers Us Rte 7 South Sanitary Sewe |
Woodbridge Fire/police Interconnect Institute For The Hispanic Family V.a Existing Ball Field Improvements Anderson Recreation Center Project Clear Trees - Va Adult Care Woodbridge Fire Station Project Manson Youth Correctional Institution Avon Town Hall The Views Area Roads Roadway Drainage - Powder Hill Road Repair And Re-pave Driveway Roadway Drainage Improvements State & Sanford St Pump Stations Dillon Stadium Burlington Fish Hatchery Archives One Broadcast Studios NBC Channel 30 Studios ESPN Green Alternate Project ESPN Building C ESPN Building 3a ESPN Building 2 Security Up Grades |
ESPN Teleport Project ESPN Cafeteria Expansion ESPN Bridge Connector ESPN Café Restrooms ESPN Building 5-canopy Addition ESPN –building 2 Roads And Housing Developments Wilders Pass Road Arlington Road Buckingham Estates Kensington Road - Buckingham Estates Grand Family Housing Whispering Woods Condo Goodwin, Fenwick, Buckingham Roads New Road Reconstruction Kensinginton Lot # 1 Thru 26 Fenwick Drive Lots #1 Thru 30 Buckingham Estates Lot #1 Thru 33- Powder Hill Lots 1 Thru 26 Churchill Plac |
SCHOOLS AND UNIVERSITIES:
Dodd Middle School
Canton Junior/Senior High School
Bleachers Sheehan High School
New Britain High School Additions
River St. School Fire Line Replacement
New Britain High Alt. Behavior Center
Bloomfield High School, Phase II
Oxford High School
Carmen Arace Middle School
New Social Science: West Building
Fairfield University Residence Quad
Wesleyan University Film Studies
HEALTH CARE FACILITIES:
Veterans Hospital Water Main
Coventry Group Home
Jerome Home
Elim Park Baptist, Wellness Center
VA Adult Care Facility
ConnectiCare Renovation Project
Natchaug Hospital
Triad Healthcare
COMMERCIAL AND INDUSTIAL
Panera Bread, Westfield Shopping Mall
Patco Gas Station
Costco
Intel Motion System
Site Work Renovations
Sovereign Bank
Photovoltaic Cell Installation
Turbojet Fuel Supply
Perry Technology Building
Middletown Nissan
BPT Innovation Center
Advance Auto Parts
Men’s Warehouse
Ameripride Service
PLACES OF WORSHIP
First Church of Windsor
Elim Park Baptist, Bethel Place Chapel
Farmington Ave. Baptist Church
MUNICIPAL AND GOVERNMENT WORK
Somers Correctional-Somers
US Rte 7 South Sanitary Sewe
Woodbridge Fire/Police Interconnect
Institute for the Hispanic Family
V.A Existing Ball Field Improvements
Anderson Recreation Center Project
Clear Trees - VA Adult Care
Woodbridge Fire Station Project
Manson Youth Correctional Institution
Avon Town Hall
The Views Area Roads
Roadway Drainage - Powder Hill Road Repair and Re-pave Driveway
Roadway Drainage Improvements
State & Sanford St Pump Stations
Dillon Stadium
Burlington Fish Hatchery
Archives One
BROADCAST STUDIOS
NBC Channel 30 Studios
ESPN Green Alternate Project
ESPN Building C
ESPN Building 3A
ESPN Building 2 Security up Grades
ESPN Teleport Project
EPSN Cafeteria Expansion
EPSN Bridge Connector
EPSN Café Restrooms
ESPN Building 5-Canopy Addition
ESPN –Building 2
ROADS AND HOUSING DEVELOPMENTS
Wilders Pass Road
Arlington Road
Buckingham Estates
Kensington Road - Buckingham Estates
Grand family Housing
Whispering Woods Condo
Goodwin, Fenwick, Buckingham Roads
New Road Reconstruction
Kensinginton lot # 1 thru 26
Fenwick Drive lots #1 thru 30
Buckingham Estates lot #1 thru 33-
Powder Hill Lots 1 Thru 26
Churchill Place